KTVK Set Addition Lighting Phase Continues
Day Five

The new set addition is looking great! The staff at KTVK were on hand to help out as Walter Olden (Olden Lighting), worked on lighting the talent and the set. It definitely takes a team to get a new set up and running. From the installation, placing set pieces and positioning the cameras, to lighting of the set, it is definitely a process that takes teamwork! Our Director Of Production, Hannes Kling, was on hand to assist as well!

Without further ado, here are some pictures of the new set addition! Thanks to Hannes for getting us some great shots!

The round desk rolls so it can be moved into different positions on the set.

Video Wall.

Using the interview platform with the new leather chairs.

The platform tucks away when not in use.

We know that everyone at KTVK is excited about the new set addition! We can't wait to see it in action!

Thanks to our readers and followers for tuning in! Have a fabulous weekend!

October 11, 2012

KTVK Set Addition; Day 4
Lighting Phase Underway

The set installation has wrapped up but the lighting of the set addition continues!

Here are a few pictures from late yesterday afternoon: Finishing touches being done on the set and some pictures during the shot blocking. (Photos courtesy of Hannes Kling, DDG's Director of Production)

Putting up the KTVK signage.

Video Wall monitor.

Sitting in for shot blocking.

Here are some great pictures from today! (Photos courtesy of KTVK)

Thank you for tuning in. We hope you have enjoyed the updates!

October 10, 2012

KTVK-TV News Set Addition Installation, Day Three

The set install is coming along nicely and is almost complete. The new set addition for KTVK was definitely designed with versatility in mind. With one side having two large 70” monitors and the other with a rear projection screen, provides KTVK with a lot of versatility in presenting their news, whether it is breaking news stories, weather or station branding. The color changing LED lights help to create different moods and looks to the set.

The round desk, with its color changing capabilities, can be rolled around and positioned in different areas of the set. And the interview platform, when not in use, rolls back under the set as part of the design! Several of the large walls are designed with back lit graphics on acrylic. The graphics are geometric and organic in design. Their overall look changes according to the color of LED light used behind them.

Word from inside the studio this afternoon is that there is a lot of buzz and excitement as the shot blocking portion of the lighting phase gets underway!

Thanks for checking in and stay tuned for more news and pics tomorrow!
(Photos courtesy of KTVK-TV.)

October 9, 2012

KTVK-TV
News Set Addition-Installation, Day Two

The set installation continues today at KTVK-TV! The scene crew is hard at work and will now install the electronics, the rear projection screen, graphics, etc. and finish up by the end of today or early in the morning. The lighting of the set will start tomorrow morning with the shot blocking process. Lighting Director, Walter Olden, will be on-site to do his magic! Hannes Kling, our Director of Production, and Dan Devlin, Creative Director of DDG, will both be on site for the shot blocking tomorrow morning!

Here are a few shots from inside the studio today:

Thanks for checking in. We will have more pictures and news tomorrow so stay tuned!
(Photos courtesy of KTVK-TV.)

October 8, 2012

KTVK-TV, Phoenix, AZ.
News Set Addition- Installation, Day One

The truck arrived in Phoenix this morning and the crew has unloaded the set pieces into the KTVK studio! The walls are being placed and then the rest of the set elements will be installed. Here are a few pictures from today.

Unloading the truck this morning.

Set pieces.

Placing the walls for the new set.


Stay tuned! We will have more news and pictures tomorrow! (Photos courtesy of KTVK-TV.)